BRCGS Food Safety Issue 9 · Section 8
Equipment and Facility Design for Risk Zones: BRCGS Section 8 Guide
Good facility design for risk zones protects ready-to-eat and sensitive products in High Risk, High Care and Ambient High Care areas. This guide covers what BRCGS Section 8 expects, five steps to put it in place and the evidence auditors ask to see.
Requirement overview
What BRCGS Section 8 requires for facility design
BRCGS Food Safety Issue 9 requires manufacturers to run zoned production areas where the design, layout and equipment suit the product risk level and effectively control cross-contamination.
Section 8 requires that premises are designed, built and maintained to prevent contamination and to support hygiene operations suited to the product and process. It also requires equipment design and layout that is fit for purpose, can be cleaned and maintained, and does not pose a contamination risk.
These requirements matter most in High Risk, High Care and Ambient High Care zones, where vulnerable products must be protected from environmental and cross-contamination risks.
Key compliance objectives
✓ Design facilities and equipment to suit the designated risk zone
✓ Control personnel and material movement to prevent contamination
✓ Ensure effective cleanability and segregation in all risk areas
✓ Maintain physical and procedural barriers between risk zones
Step by step
Five steps to facility design for risk zones
Work through these steps in order. Each one lists what to put in place and the records that prove it works.
Step 1
Identify and map production risk zones
What to put in place
✓ High Risk: chilled RTE products with a high risk of pathogen growth
✓ High Care: chilled RTE products with lower risk (for example, no direct contamination risk after processing)
✓ Ambient High Care: shelf-stable RTE products at risk from environmental contamination
Evidence to maintain
✓ Production risk zone classification map
✓ Zoning justification records
✓ Risk-based layout diagrams
Step 2
Design facilities to match zoning requirements
What to put in place
✓ Separate air handling units and positive air pressure in High Risk zones
✓ Physical barriers or walls between areas
✓ Temperature control systems and restricted access points
✓ Floor and drain design that prevents cross-zone contamination
Evidence to maintain
✓ HVAC system design specifications
✓ Floor plan with zoning details and flow direction
✓ Barrier and access control documentation
Step 3
Select equipment suitable for the risk zone
What to put in place
✓ Hygienic design, such as smooth welds and no hollow frames
✓ Easy to dismantle and clean
✓ Dedicated tools for each risk zone
✓ Resistant to corrosion and water ingress in washdown areas
Evidence to maintain
✓ Equipment specifications and approval records
✓ Cleaning validation reports
✓ Equipment zoning matrix or color-coding policy
Step 4
Control personnel, product and waste flows
What to put in place
✓ Controlled staff entry with hygiene stations and changing rooms
✓ Separate routes for raw and finished product
✓ Controlled waste removal from High Risk areas
✓ Color-coded PPE and utensils to prevent cross-use
Evidence to maintain
✓ Personnel flow diagrams
✓ PPE zoning policy
✓ Waste management SOPs and logs
Step 5
Validate and monitor risk control measures
What to put in place
✓ Environmental monitoring program (EMP) for risk zones
✓ Routine hygiene validation and swabbing
✓ Internal audits of zoning effectiveness
✓ Periodic airflow and pressure verification
Evidence to maintain
✓ EMP records
✓ Zoning audits and corrective actions
✓ Pressure differential readings and HVAC service logs
Avoid nonconformities
Common risk zone design audit findings and how to fix them
No documented risk zone classification
Fix: define each zone designation and record the rationale behind it.
Inadequate segregation or air control
Fix: upgrade the physical or airflow barriers between risk zones.
Equipment not fit for high care use
Fix: replace or modify equipment to meet hygienic design standards.
Poor personnel or product flow control
Fix: redesign routes and retrain staff on zoning policies.
Audit day
Auditor verification checklist
Auditors will verify:
✓ Facility layout maps with risk zone designations
✓ Air handling system reports, such as HEPA filtration and pressure control
✓ Equipment specifications aligned with hygienic design standards
✓ Flow control documentation for personnel, product and waste
✓ EMP and cleaning validation records
The benefit
Why risk zone design matters
Well-designed zones and equipment:
✓ Protect RTE and sensitive products from cross-contamination
✓ Align your site with BRCGS requirements for High Risk zones
✓ Show due diligence in equipment and facility design
✓ Support certification and consumer safety
Implementation roadmap
From zone mapping to continuous improvement
Phase 1
Define and design
✓ Map production areas and classify zones by product risk
✓ Design the facility layout and select suitable equipment
Phase 2
Control and segregate
✓ Install barriers and control air, people, product and waste flow
✓ Put cleaning, PPE and tool segregation protocols in place
Phase 3
Monitor and validate
✓ Run the EMP and airflow checks
✓ Audit facility and process compliance with zoning controls
Phase 4
Update and improve
✓ Review equipment and facility design after audits or incidents
✓ Upgrade or redesign as processes evolve or risks change
FAQ
Facility design for risk zones questions
What does BRCGS Section 8 require for facility and equipment design?
Premises must be designed, built and maintained to prevent contamination and support hygiene operations, and equipment must be fit for purpose, cleanable and maintainable without posing a contamination risk. This matters most in High Risk, High Care and Ambient High Care zones.
What makes equipment suitable for a High Risk or High Care zone?
Hygienic design (smooth welds, no hollow frames), easy dismantling and cleaning, dedicated tools for each zone, and resistance to corrosion and water ingress in washdown areas. Keep equipment specifications, approval records and cleaning validation reports.
How do we show auditors our zone design works?
Run an environmental monitoring program, routine hygiene validation and swabbing, internal audits of zoning effectiveness and periodic airflow and pressure checks, and keep the EMP records, audit findings and pressure readings.
Related guides
More BRCGS production risk zone guides
Production Risk Zones & Segregation
Classify zones and apply physical and procedural segregation.
Read the guide →
Air Handling & Movement
Positive pressure, filtration and airflow direction between zones.
Read the guide →
Staff Flow & Movement Procedures
Controlled entry points, PPE changes and designated routes.
Read the guide →
Get your facility design for risk zones audit-ready
We provide zoning design templates and flow maps, hygienic equipment review checklists, EMP programs for High Risk and High Care zones and staff zoning and hygiene training guides.
Food Safety Systems is an independent consulting provider and is not affiliated with, endorsed by or certified by BRCGS or the British Retail Consortium. BRCGS® is a registered trademark of the British Retail Consortium Trading Ltd. For official requirements, visit www.brcgs.com. Read our disclaimer.